Short answer: repeat production runs in 25 working days. A first order takes 35–45 days, and the extra time is not padding — it is packaging sourcing and sample approval happening for the first time. Here is where every day goes.
Stage 1 — Concept and feasibility (≈1 week)
You send the brief: target market and channel, positioning in one sentence, dosage form and servings per pack, ingredients wanted and avoided, claims you intend to make, target landed cost. We reply with formula options, dose rationale and indicative pricing — from a named account manager, within one working day of receiving a complete brief.
Stage 2 — Prototype (2–3 weeks)
Lab-scale samples for sensory and stability screening. You taste, we test; the formula settles here, where changes cost nothing.
Stage 3 — Validation (runs in parallel)
Stability and assay data that will support the shelf-life claim on your label, plus the labelling compliance review for your destination market.
Stage 4 — Pilot run
The formula runs on the actual production equipment before the commercial batch. This is where most formulation problems surface — mixing, fill weight, dosing — while they are still cheap to fix.
Stage 5 — Production, testing, release (25 working days)
Full production with batch testing and release documentation. Your technical file — specification sheet, testing records, labelling compliance notes — ships with the goods.
Why the first order is longer
Packaging materials are ordered for the first time and pre-production samples must be approved — often two or three rounds of proofs before the plates are made. Repeat orders skip all of it: 25 working days, slot booked with the quotation.
Start the clock: send your brief today and the feasibility reply comes back within one working day.